![]() |
![]() |
![]() |
|
General Discussion (Everything Else) Discuss anything that doesn't belong in any other forums here. |
![]() |
|
Thread Tools | Display Modes |
#1
|
||||
|
||||
![]() ![]() ![]() Can you match the old (letters) to the new (numbers) on the 200 amp meterbase |
#2
|
||||
|
||||
![]()
here are some close up pics
|
#3
|
|||
|
|||
![]()
A,B,C,D are feeds coming in from power supply or feeding out to house???
|
#4
|
||||
|
||||
![]()
feeds INTO the house. Had to change out the meter base before the electric company will bring power to us, thanks
|
#5
|
|||
|
|||
![]()
5=B = neutral
6=D= ground 4=A=line 3=c=line w/ meter in place 6 will feed 5 neutral 4 will feed 2 line 3 will feed 1 line I DO NOT SEE A GROUND BUS IN THE METER PAN. IT MUST HAVE ONE!!!! |
#6
|
||||
|
||||
![]()
call me , i sent you a pm.
|
#7
|
||||
|
||||
![]()
6 is for the neutral from power company, small lug to the right of 6 is for the ground, 5 is for the neutral to the house, shouldnt need a ground bus as long as you land(bond) the ground on the small mechanical lug to the right of 6
|
#8
|
||||
|
||||
![]()
and 1 and 2 would be for power company as well with 3 and 4 feeding your house....this is how I would do it.
|
#9
|
||||
|
||||
![]()
Thanks for the help, got it figured now. The base has been out there for a year and just got around to getting the shed built, they wanted us to upgrade meter boxes. Thanks agai
|
#10
|
||||
|
||||
![]()
give me a call if you need anything else but you should be good to go.
|
#11
|
|||
|
|||
![]() Quote:
I'll blame it on the glare spot and not my eyesight |
#12
|
||||
|
||||
![]()
2/0 wire also, rated for 195 amps but the inspectors let that slide for residential, commercial they make us use 3/0
|
![]() |
Bookmarks |
|
|