Quote:
Originally Posted by Andy C
Got you, probably not changeable orifices. But maybe, what I was saying is if the gas company comes by for any reason and the "tie in" was not done by a "license plumber" it could be more trouble then it saves. Not saying never done it just telling you from experience.
|
gotcha, yep I do things the right way according to building codes only.
the one jet I have can be drilled out but im not sure if doing it would give me the results im after with just one flame point under lower pressure but then I just don't know since I never tried this before.
maybe before buying the other stuff to put something together, I think i'll get another 3/8" brass acorn cap and drill it out to test how it boils the pot but the pipe on it is only 3/8" to start with and lil bubba was saying I should keep it to 1/2" so that's a question mark already.