18x51 at 4".....look in the neighborhood of an extra three or four yards of concrete. Unless you have a laser level and a better way or grating other than a shovel or front end loader, you will be 5-7" in a bunch of areas adding to concrete cost. Every slab we have ever poured had an extra truck ordered towards the finish of the job.
|