Thread: Metal Buildings
View Single Post
  #18  
Old 12-29-2014, 08:13 PM
Bdub Bdub is offline
Red Snapper
 
Join Date: Dec 2012
Location: Lake Charles
Posts: 1,412
Cash: 1,967
Default

Went from a dirt pad to this in two and a half days...with setbacks. These guys were quick and did a pretty good job of cleaning up their mess. We decided to leave a panel off for the cement pour instead of pushing cement the full length of the building. I may have them take another panel off near the door so I don't have to use a pump truck.





Rollup door and walk-in door hardware will be installed after concrete is poured. As of right now I would definitely use them again. A friend of mine built a 30 x 50 and his looks great too.
Reply With Quote