The news paper said that about 2300 sq ft. of concrete would be replaced. That looks to be a lot more than the 2300 sq ft.
I was thinking that only the area out in front of the boat launch would be replaced.
This picture shows the concrete out in front of the top of the boat ramp. Notice the concrete on the lower left in the pic., it looks to be fairly good. I don't remember what the concrete looked like in the area out by the restrooms.
.
|