View Single Post
  #2  
Old 12-22-2014, 10:41 PM
Gerald Gerald is offline
Sailfish
 
Join Date: May 2009
Location: Lake Charles / Moss Bluff
Posts: 4,648
Cash: 4,232
Default

The news paper said that about 2300 sq ft. of concrete would be replaced. That looks to be a lot more than the 2300 sq ft.

I was thinking that only the area out in front of the boat launch would be replaced.

This picture shows the concrete out in front of the top of the boat ramp. Notice the concrete on the lower left in the pic., it looks to be fairly good. I don't remember what the concrete looked like in the area out by the restrooms.

.
Attached Images
File Type: jpg Cal. pt approach.jpg (53.2 KB, 1329 views)
File Type: jpg IMG_0548.jpg (47.7 KB, 1331 views)
Reply With Quote