Quote:
Originally Posted by ckinchen
on the ship channel.
My permit was approved today and I need approximately 1,000 yards of dirt to help backfill land that has eroded.
If you know of someone that may be interested in the dirt work portion of this project please let me know. Also any cost per load information and or number of loads needed would be helpful.
|
If I'm not mistaken an 18 wheeler is 25 yards 1000/25 in 40 loads, with a dump truck about 13-14 yards 1000/13-14 is about 70-77 loads.