sorry....was asking OP....Raymond
|
6 Attachment(s)
Here is a double wide that was lifted in Creole.
|
6 Attachment(s)
It took one day to lift, put together and anchor down to the pilings and braces.
|
Lazy Duhon's
2 Attachment(s)
We know what work is. We sat around all day and watched it.
|
How you get in it?
|
Ladder, until the porches and stairs were built.
We were there to hook up the a/c. |
again....how much does something like that usually cost? The pilings and lifting of a home?
|
That one cost her around $48K to do it all. Drill and set the pilings, brace, pour cement slab, lift, put together the trailer, anchor it down and hook up water, sewer and elect.
|
Ray.....after the second 1/2 was put in place, how did they close the small cap between the two halves of the trailer?
Were there a bunch of plates welded underneath the frame to put big bolts through them? And then just tighten the bolts to bring the two halves together? |
Looks like the unit just south of the old Gaspards on the Creole Hwy.
|
Looks pretty cool
|
All times are GMT -5. The time now is 05:41 AM. |
Powered by vBulletin®
Copyright ©2000 - [ARG:3 UNDEFINED], Jelsoft Enterprises Ltd.
vB.Sponsors
All content, images, designs, and logos are Copyright © 2009-2012,
Salty Cajun, LLC
No unathorized use is permitted